Online videos make remodels look fast and easy — but real timelines require planning, permits, inspections, and coordinating multiple trades.
Here’s the truth about remodel timelines from a designer + former GC who’s done this for 15 years.
Realistic timeline: 6–12 weeks
Includes:
Cabinet lead times
Electrical
Plumbing
Drywall
Flooring
Countertops
Final punch list
Those “2-week” TikTok kitchens skip the real steps.
Average timeline: 3–8 weeks
Why?
Waterproofing
Tile setting
Plumbing changes
Custom glass lead times
Realistic timeline: 3–9 months
Depending on permits, inspections, and trade scheduling.
Having your:
✔ floor plans
✔ 3D views
✔ material selections
✔ renderings
…completed BEFORE hiring a contractor saves weeks of delays.
Contractors build.
Designers plan.
You need both.
Lead times that affect schedules:
Custom cabinets (4–12 weeks)
Tile deliveries
Appliance delays
Glass shower orders
Planning ahead saves stress.
If you don’t have:
lighting plan
plumbing layout
cabinet elevations
material list
…your contractor cannot give a real timeline.
We create full design packages so your contractor can schedule your project accurately and avoid delays.
👉 https://remodelingconsultants.org/booking-page-calendar-2973-4872
About Remodeling Consultants
We help homeowners and contractors virtually, with remodeling consultations, floor plans, 3D views, elevations ,material selections and furniture selections
© copyright 2025 | Remodeling Consultants LLC | All Rights Reserved.
Connect Us
Quick Links
© copyright 2026 | Remodeling Consultants LLC | All Rights Reserved.